Case Study · Emergency 5kV Switchgear Repair

Emergency 15kV Switchgear Repair Leads to Full Facility Electrical Upgrade

Client: Jordan Lumber

Service: Medium-Voltage Switchgear Repair & Electrical Service Replacement

The Challenge

Jordan Lumber’s incoming 15 kV main switchgear failed catastrophically when the main feed burned up inside the gear. The utility-side installation used unconventional flexible medium-voltage cable and terminations that were unfamiliar to most electrical contractors, immediately narrowing the pool of qualified responders.

Complicating matters further, the switchgear itself was roughly 60 years old, and the facility’s owner confirmed that its monitoring systems and protective safeties hadn’t been in active use for years. The equipment had effectively been running as an unmonitored pass-through meaning any repair had to be planned without the safety net that modern switchgear would normally provide.

With production down and multiple contractors on site to assess the damage, Jordan Lumber needed a fast, informed decision not just a fix.

SEI’s Approach

When SEI’s Electrical Foreman arrived on site, three other contractors were already present, each bringing along their own teams. Rather than jumping into the conversation, SEI’s Foreman held back, observed, and let the group discuss the problem first gathering information before offering an opinion.

When the owner directly asked for a recommendation, SEI answered with questions of its own: were any of the switchgear’s monitoring capabilities or safety interlocks still functional? The owner confirmed they weren’t, the equipment was rarely inspected and had become a simple pass-through connection.

With that context, SEI laid out two honest options:

  • Full, code-compliant repair that would restore complete functionality, safeties, and monitor an estimated two-month project.

  • Short-term remediation to get the facility back online quickly: scrub out the cubicle, replace the arresters and flexible ductwork, and bring the system back up without reinstating the aging safety and monitoring systems. Estimated timeline: 4–5 days after materials arrived, with no guarantee of outcome.

Given the production impact of extended downtime, the owner chose the short-term path fully informed of the risk and the absence of any warranty on the result.

The Result

SEI’s remediation worked. Materials arrived, the cubicle was scrubbed clean, the arresters and flexible conductors were replaced, and Jordan Lumber’s facility was back up and running within the estimated window.

The success of that emergency repair earned more than a restored connection it earned trust. The facility owner was impressed enough with SEI’s work that he made the decision to replace the entire incoming electrical service and permanently retire the 60-year-old switchgear rather than continue relying on aging, unmonitored equipment.

SEI was awarded that follow-on project as well, engineering and installing brand-new incoming services throughout the facility, resulting in no more medium voltage for the facility to be responsible for. The result: a facility running on modern, fully monitored electrical infrastructure safer, more reliable, and built for the long term.

Why It Matters

This project highlights what sets SEI apart on complex, high-stakes electrical work:

Diagnostic discipline

Taking the time to understand the real condition of aging equipment before recommending a path forward, rather than defaulting to a one-size-fits-all fix.

Transparent risk communication

Giving the client clear, honest options (including the risks of a faster fix) instead of overselling a guaranteed outcome.

Long-term thinking

Using a short-term solution to buy time for the right long-term investment, rather than treating the emergency repair as the end of the conversation.

The outcome speaks for itself: a mill that once ran on 60-year-old, unmonitored switchgear now operates on fully modern electrical service, a direct result of SEI’s judgment under pressure and the trust it earned on day one.